Development of Laem Chabang Port Q & A Interesting Facts Progress Link Contact
Home

 

In Phase 3 development, modern machinery and technology will be installed to accelerate work processes, deliver faster services, and reduce pollution.

The new equipment will include:

  • Automated Stacking Cranes (ASC) to lift containers out of or onto trucks at yards behind terminals.
  • Automated Guided Vehicles (AGV) to transport containers between yards and front ports.
  • Gantry Cranes to lift two 20-feet containers simultaneously. This crane is used for lifting containers out of or onto vessels.
  • Electric Dredging: Dredgers powered partially or fully by electrical energy will be employed. Being clean energy, electrical power will not pollute the environment. However, electric dredgers are appropriate for channel maintenance only.   
  • Cold Ironing: This system provides shoreside electrical power to vessels at quays. The service will cut dependence on diesel-powered generators. Using clean energy, cold ironing serves power, lighting, cooling, heating and air-conditioning systems on vessels.
  • e-Port: Comprehensive electronic services will be introduced with less paperwork involved; a hi-speed communications network shared by the Customs Department, Laem Chabang Port, and other ports will be launched. A Radio-frequency Identification (RFID) & Electronic Seal-based checking system will also be in use at checking posts.
Enhancing Shipping Management Capacity
Branching Out
Fruits of Success
Transportation for Sustainable Economic Growth
Green Port
Modern Technology for Greater Capacity

Number of Visitors