Development of Laem Chabang Port Q & A Interesting Facts Progress Link Contact
Home

 

Because the first phase of Laem Chabang Port soon reached full capacity, the government had to urgently move forward into Phase 2 to accommodate more containers. Second phase capacity subsequently reached 6.8 million TEUs.

Structure of Port U-shaped
Size of Port   500-metre width, 1,800-metre length
Depth of Mooring Basin -16 metres at mean sea level
Channel Depth to Terminals -16 metres at mean sea level
Breakwater Length  1,900 metres added to the old structure Combined length of 3,200 metres
Size of Ships  Post Panamax (80,000 DWT, with capacity to carry more than 5,000 TEUs)

No. of Quays

Disaggregated:

7
  • Container Vessels Terminals
  • Ro/Ro Terminal for Cars/General Cargos

6
1

Total capacity for cargos 
6.8 million TEUs
Enhancing Shipping Management Capacity
Branching Out
Fruits of Success
Transportation for Sustainable Economic Growth
Green Port
Modern Technology for Greater Capacity

Number of Visitors